Tekmar 263 Boiler Control User Manual Page 24

  • Download
  • Add to my manuals
  • Print
  • Page
    / 36
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 23
© 2009 D 263 - 03/09 24 of 36
DHW Pump Or Valve (DHW Pmp / Vlv)
If a DHW pump or DHW valve is connected to the DHW Pmp / Vlv terminals (9 and 10),
make sure the power to the pump or valve circuit is off and install a jumper between
those terminals. When the DHW circuit is powered up, the DHW pump should turn on or
the DHW valve should open completely. If the DHW pump or valve fails to operate, check
the wiring between the terminals and the pump or valve and refer to any installation
or troubleshooting information supplied with these devices. If the DHW pump or valve
operates correctly, disconnect the power and remove the jumper.
CONNECTING THE CONTROL
Make sure all power to the devices and terminal blocks is off, and remove any remaining
jumpers from the terminals.
Reconnect the terminal blocks to the control by carefully aligning them with their respective
headers on the control, and then pushing the terminal blocks into the headers. The terminal
blocks should snap firmly into place.
Install the supplied safety dividers between the unpowered sensor inputs and the powered
or 115 V (ac) wiring chambers.
Apply power to the control. The operation of the control on power up is described in the
Sequence of Operation section of the brochure.
TEST THE MODULATING OUTPUT
If a modulating device is used, connect an ammeter to the modulating
output Mod 1 terminals (15 and 16) and observe the current reading
during operation. For example, when using a 4-20 mA output, the initial
percentage output is zero and the meter should read 4 mA. As the Boiler
Modulation in the VIEW menu increases, the meter reading should
increase until the Boiler Modulation reaches 100% at which point the
meter should read 20 mA. When the 4-20 mA modulation decreases, the
meter should start at 20 mA and eventually reach 4 mA when the display
shows 0% Boiler Modulation.
Cleaning the Control
The control’s exterior can be cleaned using a damp cloth. Moisten the cloth with water and wring out prior to wiping control. Do not
use solvents or cleaning solutions.
L
N
10
9
DHW
Pmp/Vlv
24 to 230 V (ac)
M
or
8
9
6
10
Prim
P1
L
N
DHW
Pmp/Vlv
Power
7
mA
16
15
Mod 1 mA
-
+
Page view 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 35 36

Comments to this Manuals

No comments